A Division of Zentech Construction | 604-935-6976 | info@stonnex.com
ICBA Member · WorkSafeBC Covered · Google Guaranteed · BBB Accredited
Terms and Acceptance
Accept Your Quote
Confirm the quote you are accepting, review the Terms of Work and sign below. It takes about two minutes.
Your Details
Add the six digits from the top right of your quote.
Name the shingle, and the buildings if your quote prices more than one.
Terms of Work
Scope. The work is the roofing scope described in this quote for the option and buildings selected below. Anything not listed is excluded. Additional work is done only on a written change order, priced and approved before it starts.
Concealed conditions. The price assumes a sound roof deck and structure. Rotten or damaged plywood found after tear-off is replaced at the per-sheet rate on this quote. Other concealed conditions, including structural defects, extra layers of roofing and hazardous materials, are outside the price. Work in the affected area stops until a written price is agreed.
Price. Pricing is valid for 30 days from the quote date. Once accepted with the deposit, the price is held for the scheduled install. GST is added on the invoice.
Payment and interest. Deposit and balance are due as set out in this quote. The balance is due on completion. Any amount not paid when due carries interest at 20% per year, calculated daily from the due date until paid. Materials remain the property of Stonnex until paid in full.
Lien and collection. The owner acknowledges that Stonnex may file a claim of lien against the property under the Builders Lien Act for any unpaid amount, without further notice. The owner pays all costs of collection, including lien filing costs and legal fees on a full indemnity basis.
Schedule and weather. Start and completion dates are estimates. Roofing depends on weather and material supply, and Stonnex is not liable for delays caused by either. The roof is left watertight at the end of each working day.
Access and site. The owner provides clear driveway access for the bin and material delivery, plus exterior power and water. Vehicles and loose items must be moved from the work area before the start date. The bin and delivery trucks are heavy; Stonnex is not responsible for cracking or marking of driveways or walkways.
Existing conditions. Tear-off causes vibration. Stonnex is not responsible for items falling inside the home, drywall nail pops, or pre-existing defects in the structure, attic ventilation design, skylights, gutters or chimneys. Satellite dishes, solar panels and antennas are removed and reset by others unless listed in the scope.
Limit of liability. To the fullest extent the law allows, Stonnex's total liability for any claim arising from this work is limited to the amount paid under this quote. Stonnex is not liable for indirect or consequential loss, including loss of use, lost income, or damage to interior finishes and contents, however caused. The owner releases Stonnex from claims arising from the conditions described in sections 2, 7 and 8.
Product and colour. The owner confirms the shingle and colour in writing before materials are ordered. Shade varies between production runs and against samples. Special-order materials cannot be returned once ordered.
Cancellation. If the owner cancels after materials are ordered, the owner pays supplier restocking charges, non-returnable materials and work done to date. The deposit is applied to those costs.
Warranty. The Stonnex labour warranty stated in this quote starts on completion and applies once the invoice is paid in full. It covers workmanship. It does not cover damage from storms, falling objects, ice damming, foot traffic, or work by others on the roof after completion. Shingle warranties are provided by the manufacturer on its terms.
Agreement. This quote and these terms are the whole agreement and replace earlier discussions. Changes must be in writing. British Columbia law applies.
Signature
Sign with your finger or mouse.
A $500 deposit confirms the booking and holds your pricing. We will contact you to arrange it.
Accepted
Thank you. Your acceptance is recorded.
We will be in touch within one business day to confirm your booking and deposit. Save or print this page for your records.
Reference
Signed
Quote
Name
Property
Accepted
Signature
Terms of Work Accepted
Scope. The work is the roofing scope described in this quote for the option and buildings selected below. Anything not listed is excluded. Additional work is done only on a written change order, priced and approved before it starts.
Concealed conditions. The price assumes a sound roof deck and structure. Rotten or damaged plywood found after tear-off is replaced at the per-sheet rate on this quote. Other concealed conditions, including structural defects, extra layers of roofing and hazardous materials, are outside the price. Work in the affected area stops until a written price is agreed.
Price. Pricing is valid for 30 days from the quote date. Once accepted with the deposit, the price is held for the scheduled install. GST is added on the invoice.
Payment and interest. Deposit and balance are due as set out in this quote. The balance is due on completion. Any amount not paid when due carries interest at 20% per year, calculated daily from the due date until paid. Materials remain the property of Stonnex until paid in full.
Lien and collection. The owner acknowledges that Stonnex may file a claim of lien against the property under the Builders Lien Act for any unpaid amount, without further notice. The owner pays all costs of collection, including lien filing costs and legal fees on a full indemnity basis.
Schedule and weather. Start and completion dates are estimates. Roofing depends on weather and material supply, and Stonnex is not liable for delays caused by either. The roof is left watertight at the end of each working day.
Access and site. The owner provides clear driveway access for the bin and material delivery, plus exterior power and water. Vehicles and loose items must be moved from the work area before the start date. The bin and delivery trucks are heavy; Stonnex is not responsible for cracking or marking of driveways or walkways.
Existing conditions. Tear-off causes vibration. Stonnex is not responsible for items falling inside the home, drywall nail pops, or pre-existing defects in the structure, attic ventilation design, skylights, gutters or chimneys. Satellite dishes, solar panels and antennas are removed and reset by others unless listed in the scope.
Limit of liability. To the fullest extent the law allows, Stonnex's total liability for any claim arising from this work is limited to the amount paid under this quote. Stonnex is not liable for indirect or consequential loss, including loss of use, lost income, or damage to interior finishes and contents, however caused. The owner releases Stonnex from claims arising from the conditions described in sections 2, 7 and 8.
Product and colour. The owner confirms the shingle and colour in writing before materials are ordered. Shade varies between production runs and against samples. Special-order materials cannot be returned once ordered.
Cancellation. If the owner cancels after materials are ordered, the owner pays supplier restocking charges, non-returnable materials and work done to date. The deposit is applied to those costs.
Warranty. The Stonnex labour warranty stated in this quote starts on completion and applies once the invoice is paid in full. It covers workmanship. It does not cover damage from storms, falling objects, ice damming, foot traffic, or work by others on the roof after completion. Shingle warranties are provided by the manufacturer on its terms.
Agreement. This quote and these terms are the whole agreement and replace earlier discussions. Changes must be in writing. British Columbia law applies.